madeira.fun

Madeira Hiking Permit Report - September 2026

How permit availability and booking pressure looked across Madeira's protected PR trails during September 2026, summarized from daily observations of the official Simplifica reservation system. Figures are careful estimates, not exact spot counts.

Key findings

By trail

TrailNameAvg booking pressureDays with availability
PR1 Vereda do Areeiro to Pico Ruivo (One Way) very high (8.9) 33%
PR6 Levada das 25 Fontes high (7.6) 97%
PR8 Vereda da Ponta de São Lourenço high (7.6) 93%
PR1 Vereda do Areeiro to Miradouro Pedra Rija (Stairway to Heaven) moderate (5.3) 100%
PR9 Levada do Caldeirão Verde low (3.2) 100%
PR11 Vereda dos Balcões low (3.1) 100%
PR1.2 Vereda do Pico Ruivo low (3) 100%
PR6.2 Levada do Alecrim low (2.8) 100%
PR13 Vereda do Fanal low (2.8) 100%
PR6.1 Levada do Risco low (2.7) 100%
PR16 Levada Fajã do Rodrigues low (2.6) 100%
PR15 Vereda da Ribeira da Janela low (2.6) 100%
PR10 Levada do Furado low (2.6) 100%
PR6.3 Vereda da Lagoa do Vento low (2.6) 100%
PR9.1 Caldeirão Verde (Accessible) low (2.6) 100%
PR6.6 Vereda do Túnel do Cavalo low (2.6) 100%
PR14 Levada dos Cedros low (2.6) 100%
PR18 Levada do Rei low (2.6) 100%
PR17 Caminho do Pináculo e Folhadal low (2.6) 100%
PR6.8 Levada do Paul II low (2.4) 100%
PR1.1 Vereda da Ilha low (2.2) 100%
PR6.5 Vereda do Pico Fernandes low (2.2) 100%
PR6.4 Levada Velha do Rabaçal low (2) 100%
PR22 Vereda do Chão dos Louros very low (1.9) 100%
PR13.1 Vereda da Palha Carga very low (1.6) 100%
PR2 Vereda do Urzal very low (1) 100%
PR6.7 Vereda da Câmara de Carga do Rabaçal very low (0.9) 100%
PR19 Caminho Real do Paul do Mar very low (0.5) 100%
PS PR1 Vereda do Pico Branco e Terra Chã very low (0.4) 100%
PR5 Vereda das Funduras very low (0.1) 100%
PS PR2 Vereda do Pico do Castelo very low (0.1) 100%
PR21 Caminho do Norte very low (0.1) 100%
PR12 Caminho Real da Encumeada insufficient data 0%

"Days with availability" is the share of observed days a trail had at least one open tourist slot in the next 7 days; "no data" means the trail was not observed. Booking pressure methodology.

About This Report. Period: 1 September 2026 to 30 September 2026. Observed on 30 of 30 days, one snapshot per day at 21:00 UTC. Cohort: the tourist quota of 33 permit trails. Method: MF-BPS-1.0. Live availability, which this archive cannot show, is on the availability page.

Check current availability and reserve

All permit reports · Live availability